1·Building a boat bridge between the plant and earth dam.
在电厂与土坝间建立一座浮桥。
2·As "bottlenecks" in the earth dam, the selection of the spillway is crucial.
作为土石坝的“卡脖子”工程,溢洪道方案的选择至关重要。
3·Minitype reservoir distributes area being a homogeneity earth dam broad, and many.
小型水库分布区域广,且多为均质土坝。
4·The reservoir dam is an earth dam with a clay core wall, built earliest in our country.
水库大坝是我国建设最早的碾压式粘土心墙土石坝。
5·So it is very important to research in seepage calculation and monitoring of earth dam.
因此,对土石坝的渗流计算和渗流监测问题进行研究具有十分重要的意义。
6·With the length of 6160m of the main and secondary earth dam, Nihe is a large reservoir.
泥河水库是一座大型平原水库,主副坝长度总计6160。
7·The validity of the method is demonstrated by calculating the observation data of an earth dam.
通过对某土石坝观测资料的计算,表明这一方法是可行和有效的。
8·Meanwhile, a mechanism appeared very recently for earth dam breaking is also introduced and analyzed.
还对一种新出现的土坝溃坝机理学说进行了介绍和分析;
9·All the achievements can be as reference in the nonlinear stress and strain analysis of the earth dam.
这些成果均可供土坝非线性应力应变分析中使用。
10·The dam of Lingao Reservoir is a rolled earth dam with relative height and the secondary importance grade.
岭澳水库土坝是一座较高的碾压式土石坝,为二级建筑物。
1·Building a boat bridge between the plant and earth dam.
在电厂与土坝间建立一座浮桥。
2·Earth dam is one of the most important constructions of the reservoir pivot and its function is to impound flood water.
土坝是水库枢纽的主要建筑物之一,主要起着拦蓄洪水的作用。
3·Seepage free surface issue exists in analysis of the seepage concerning geotechnical slope, earth dam, underground cave and groundwater movement.
在岩土边坡、土坝、地下洞室及地下水运动等渗流分析中,均存在有渗流自由面问题。
4·Lots of articles have introduced the calculation method of earth dam seepage with pervious ground base or impervious ground base so far.
迄今为止,已有大量的文献介绍建立在透水或不透水地基上的土坝渗流计算方法。
5·The paper discusses the mechanism, design and construction technology in seepage control of split grouting technique for earth dam body, and thereby proves its application value.
文中阐述了土坝坝体劈裂灌浆防渗技术的机理、设计和施工要求,展现了该技术良好的推广价值。